Skip to content

For PVC pipe & fittings suppliers

One wrong digit. A completely different product.

Sizes, schedules, lengths, fittings, and customer part numbers. Every line has to match. Zaqa reads your customers' POs, matches the details to your catalog, flags what's unclear, and gets approved orders into your existing ERP.

The right product. The right quantity. Without all the rekeying.

/Clearwater Site SupplyClearwater-PO-6118.pdf

Clearwater Site Supply

Purchase order

PO-6118

11/13/26

Ship to: Hillcrest Project Site, Lancaster, PA

QtyDescription
18STK2 PVC SCH40 PE 20FTCust # CSS-2040-20
8STK3IN PVC 80 GREY 10FT PECust # CSS-3080-10G
36EA2 SCH40 PVC 90 SLIPCust # CSS-E90-2
24EA4 PVC TEE — 24 PCSno cust #

Deliver 7AM–3PM, call site super on arrival. Ship complete.

Matched to your catalog

Order draft · PO-6118

New
Approve order

01 · Customer PO received

Sound familiar?

Looks like the same pipe. Isn't the same pipe.

A customer orders 2-inch pipe. Then another 2-inch pipe with a different schedule. Then a fitting with the connection type left out.

Your team knows those differences matter. But they still have to interpret every line, find the right catalog item and enter it all into the ERP.

01

The descriptions don't match your catalog.

Every customer has their own abbreviations, part numbers and shorthand.

Your team has to translate them into the items you actually sell.

  • Clearwater Site Supply2 PVC SCH40 PE 20FT
  • Ridgeline IrrigationRIC-1102
  • Keystone PlumbingPVC 2" S40 PLN END 20'
  • Valley Waterworks2X20 SCH 40 WHT

PVC-P40-200-20-PE

2" PVC · SCH 40 · plain end · 20 ft · white

Illustrative. Four ways of asking for the same stick.

02

Small differences matter.

Schedule 40 or Schedule 80. Plain end or bell end. Slip or threaded.

One detail can change which product should be shipped.

2" PVC pipe · OD 2.375"

SCH 40wall 0.154" · White
SCH 80wall 0.218" · Gray
Plain end ≠ Bell endSlip ≠ Threaded

Same nominal size. Different product, different item to ship.

03

Long orders take a long time to enter.

A customer sends a 75-line PO. Your team has to identify, verify and rekey each item.

The order may be familiar, but the manual work hasn't gone away.

ERP · order entry · PO-7740Line 24 of 75
21PVC-C40-150-SXS1-1/2 SCH40 COUPLING48
22PVC-P40-150-20-PE1-1/2 PVC 40 PE 20FT30
23PVC-R40-300-2003X2 REDUCER BUSHING12
244 PVC 45 SLIP 4016

Illustrative. 51 lines to go, and two more POs in the inbox.

Your product experts should be handling the exceptions, not entering the same pipe orders all day.

From customer PO to ERP

Long product lists. Shorter order-entry process.

The Clearwater PO, line by line: the customer's shorthand on one side, the item you'll ship on the other.

Clearwater Site Supply6:58 AM

PO-6118 — Hillcrest Job

“PO attached. Need it on site by the 20th. Same pricing as the Elm job.”

PDF Clearwater-PO-6118.pdf
  • 2 PVC SCH40 PE 20FT18 STK
  • 3IN PVC 80 GREY 10FT PE8 STK
  • 2 SCH40 PVC 90 SLIP36 EA
  • 4 PVC TEE — 24 PCS24 EA

Sample order and illustrative screens. Customer, item numbers and prices are fictional.

Repeat orders, without the repeat work

Same customer. Same products. Another release to key in.

A customer sends a release against an existing blanket order. The products may be familiar, but someone still needs to check the item references, quantities, ship-to location and requested date.

Release · from Ridgeline Irrigation Co.

Blanket PO
BPO-2210
Release
#07
Ship to
Yard 3, Dover Rd
Requested
Dec 2

RIC-1102 · 40
RIC-1140 · 60
RIC-1215 · 12
RIC-1188 · 20

Order draft · BPO-2210 release #07 · ship Dec 2

1 to review
  • RIC-1102PVC-P40-200-20-PE2" Sch 40 pipe, 20 ft40 STK
  • RIC-1140PVC-E90-200-S40-SXS2" Sch 40 90° slip60 EA
  • RIC-1215PVC-P80-300-10-PE3" Sch 80 pipe, 10 ft12 STK
  • RIC-1188! Customer # not mappedNot in this customer's item list20 EA

Illustrative. The release is read like any order. What's left on the blanket, allocation and scheduling stay in your ERP.

Built for the way you sell PVC

Your products have more details than a part number.

Match exact product specifications

Size, schedule, length, end and connection are what identify the item, not the words around them.

2 PVC SCH40 PE 20FT → PVC-P40-200-20-PE

Understand your customers' part numbers

Customers use their own references and shorthand. Your customer mappings turn them into your items.

RIC-1102 → PVC-P40-200-20-PE

Respect your selling units

Sticks, feet, each, cartons: quantities follow the units configured in your catalog.

18 sticks × 20 ft = 360 ft

Keep exceptions visible

An incomplete line is resolved by your team, not guessed by the software.

4 PVC TEE · schedule ? · connection ?

Keep your existing ERP

Approved orders go into the order-entry process you already run.

Approved · entered in your ERP

Support repeat customer ordering

Familiar orders and blanket releases don't need every line keyed in by hand again.

BPO-2210 · release #07 · 4 lines

Before and after

Same customer PO. A lot less manual entry.

Without Zaqa

  1. 1Open the customer PO
  2. 2Read every line
  3. 3Interpret customer part numbers
  4. 4Search the product catalog
  5. 5Check size and schedule
  6. 6Confirm length and end type
  7. 7Verify selling units
  8. 8Clarify ambiguous items
  9. 9Re-enter the order in the ERP

By hand, line by line, on every PO.

With Zaqa

  1. 1Receive the customer POAs always
  2. 2Review prepared catalog matchesYour team
  3. 3Resolve flagged exceptionsYour team
  4. 4Approve the order; then it goes into your ERPYour team

The decoding, lookups and entry are done before your team opens it. The judgment calls stay theirs.

Customer story · Global Furniture Group

Not a pipe supplier. The same order-entry problem.

Global Furniture Group makes furniture, not pipe and fittings. But their team faced the same work your customer service desk does: long orders in every format, items defined by small details, and every line matched to the right product and keyed into an IBM AS/400 by hand.

31 → 2 min
Hands-on time per order
7,200
Orders in the first 90 days
3,400+ hrs
Returned to their team

These are their furniture results, not PVC ones. The idea carries over: Zaqa matches each line to what you sell, your team settles what's flagged, and your ERP stays put.

Read the Customer Story

Common questions

Same size doesn't always mean the same product. We know.

Yes. Schedule is part of the match, along with size, material, length, end type and connection, so a 2" Schedule 40 line and a 2" Schedule 80 line go to different catalog items. Zaqa never treats one as a stand-in for the other.
Zaqa matches customer part numbers to your items using the customer mappings you maintain, and reads shorthand descriptions against your catalog. A customer number it hasn't seen before is flagged so your team can confirm it.
Yes, using the units you've configured. If a customer orders 18 sticks of 20-foot pipe and you sell by the foot, the order shows both: 18 sticks and 360 feet. Cartons, bundles and other packaging follow your catalog's rules, not a general assumption.
Fittings are matched on type, angle, size (including both sizes on a reducer), schedule and connection, such as slip or threaded. When one of those is missing, the line is flagged rather than filled in.
The line goes to your team with what's missing and the catalog items it could be, all unconfirmed. Someone confirms it with the customer before the line is entered.
Pressure pipe, DWV, conduit and specialty products are matched as the separate families they are in your catalog. Zaqa doesn't treat products as equivalent because they share a size or a color, and it doesn't make standards or pressure-rating decisions.
Zaqa reads a release like any other order: the blanket reference, customer item numbers, quantities, ship-to and dates, matched to your items. Tracking what's left on the blanket, allocation and scheduling stay in your ERP.
Zaqa uses the customer pricing you make available to it, so each line is priced the way you price that customer. We confirm how pricing is set up with you during discovery.
No. Zaqa enters approved orders into your existing ERP. How it connects depends on your system and the access available; we confirm the approach with you during discovery.
Yes. Every order is reviewed beside the PO it came from, with anything uncertain flagged, and nothing reaches your ERP until a person approves it.

Let's see your PVC orders

Bring us the PO with 100 lines of pipe and fittings.

The customer part numbers. The different schedules. The lengths that need checking. The fitting description that could mean two different products.

Let's see what Zaqa can take off your team's plate.

Your customers keep ordering their way. Your team stops doing all the rekeying.