Skip to content

For electrical components suppliers

Quote the whole bill of materials. Not one part number at a time.

Contractors send long BOMs with manufacturer part numbers, shorthand descriptions and missing details. Zaqa matches the lines to your catalog, flags what needs attention, and prepares the quote for your team to approve. Your ERP stays as it is.

Less searching. Less rekeying. More quotes out the door.

/Ridgeway Electrical ContractorsNorth-Plant-Electrical-BOM.xlsx
A1Ridgeway Electrical Contractors · North Plant Panel Upgrade

Ridgeway Electrical Contractors

RFQ-2746 · November 16, 2026

Project: North Plant Panel Upgrade

#Part no.DescriptionSpecQty
01BR-QB2202P circuit breaker20A 240VAC12
02KS-FT6-GYFeed-thru term block6mm² gray DIN48
03HV-C32-3P3P contactor32A coil: —2
04NV-12201608Enclosure, wall mtNEMA 12 20x16x81

Confirm any proposed substitutions before quoting.

Matched to your catalog

Quote draft · RFQ-2746

New
Approve quote

01 · BOM received

Sound familiar?

The BOM is already written. Why is your team entering it again?

A contractor sends over a list of components. Sometimes it's a clean spreadsheet. Sometimes it's a PDF with part numbers from three different manufacturers and descriptions only the contractor understands.

Either way, someone on your team has to turn it into an accurate quote.

01

Fifty lines. Fifty lookups.

Part numbers, descriptions, catalog searches and quantities. Your inside sales team spends valuable time finding the items before they can even start quoting.

Catalog searchLine 7 of 54
  • BR-QB2200 results
  • QB2203 results · none 240V
  • 2P 20A breaker 24041 results

Illustrative. Then the next line, and the 46 after that.

02

Close enough isn't good enough.

A different pole count. The wrong coil voltage. A terminal block with the wrong specs.

One wrong match can cause problems further down the line. Your team needs to know what matches and what still needs checking.

Requested

3P contactor · 32A · coil 120VAC · Qty 2

  • CT-3P-32-24D

    32A3-pole24V DC coil

    ✕ Coil voltage
  • CT-3P-25-120A

    25A3-pole120V AC coil

    ✕ Current rating
  • CT-3P-32-120A

    32A3-pole120V AC coil

    ✓ Matches

Illustrative catalog items.

03

Every quote competes for the same hours.

While your team builds one long quote, more RFQs arrive.

The problem isn't that your people don't know the products. It's how much manual work comes before they can use that expertise.

Open RFQs

  • RFQ-2746Ridgeway Electrical54 lines
  • RFQ-2747Corbin Industrial18 lines
  • RFQ-2748Lakeview Systems96 lines
  • RFQ-2751Delgado Maintenance9 lines

Illustrative. Every line on every list still has to be found first.

Your product experts should be making decisions. Not copying part numbers.

From BOM to quote

Send the parts list. Skip the manual lookup marathon.

Your customers keep sending RFQs the way they always have. Zaqa takes care of the repetitive work between the request and the quote.

Quotes inbox

  • Ridgeway Electrical Contractors

    RFQ-2746 · North Plant Panel Upgrade

  • Corbin Industrial Services

    Panel 4 spares, please quote

  • Lakeview Systems Integration

    RE: MCC retrofit, rev B

  • Delgado Maintenance

    Need pricing on the list below

Sample RFQ and illustrative screens. Part numbers, SKUs and prices are fictional.

Built for the way you quote

Your catalog is complicated enough. Quoting it shouldn't be.

Beyond extracting text

Reading the characters on a BOM isn't the job. The manufacturer numbers and descriptions have to become catalog lines you can quote.

BR-QB220 → CB-2P-20-240

Your catalog is the source of truth

Matches come from your catalog and product information. Zaqa doesn't invent part numbers or decide that two parts are interchangeable.

Every line points to an item you carry

Exceptions stay visible

Uncertain matches, missing specs and possible alternatives go to your team, with the reason they were flagged.

Coil voltage missing · 2 configurations, unconfirmed

Your ERP workflow stays in place

The quote is prepared for your team to approve, within the process you already use. This isn't an ERP replacement.

Quote draft, for your team to approve

Contractors don't change how they ask

They keep sending spreadsheets, PDFs and emailed lists. No portal, no template to fill in.

BOM.xlsx · spares-list.pdf · an email with 9 lines

Before and after

Same BOM. A very different way to quote it.

Before Zaqa

  1. 1Open the contractor's spreadsheet
  2. 2Search each manufacturer part number
  3. 3Check for the matching catalog item
  4. 4Verify specs and quantities
  5. 5Chase down the unclear items
  6. 6Key the quote into the ERP

Every step by hand, for every line.

With Zaqa

  1. 1Receive the BOMAs always
  2. 2Review the catalog matches Zaqa preparedYour team
  3. 3Resolve the flagged exceptionsYour team
  4. 4Review the prepared quoteYour team

The searching and rekeying are done before your team opens it. The decisions stay theirs.

Customer story · Global Furniture Group

Different products. The same lookup problem.

Global Furniture Group isn't an electrical supplier. But their order desk had the problem your quote desk has: more than six million SKUs, customer documents in every format, and every line found in the catalog and keyed into an IBM AS/400 by hand.

31 → 2 min
Hands-on time per order
7,200
Orders in the first 90 days
3,400+ hrs
Returned to their team

Same idea for a BOM: Zaqa matches each line against your catalog, your team handles what's flagged, and your ERP stays put.

Read the Customer Story

One line, up close

Every line keeps what makes it the right part.

The manufacturer number, the ratings, the quantity and the unit stay attached to the line from the contractor's list to your quote, so your team can see exactly what was matched and why.

CB-2P-20-240

2-Pole Circuit Breaker · RFQ-2746, line 01

Manufacturer & part no.
Brantley · BR-QB220
→ your item CB-2P-20-240
Description
2P circuit breaker
Kept with the line for review
Ratings
20A · 240V AC · 2-pole
Must match your catalog item
Quantity & UOM
12 EA
Carried into the quote
Price
$48.60 ea
From your configured pricing

Sample line from the illustrative RFQ above.

Common questions

Real questions from teams that quote electrical components.

Yes. Zaqa matches manufacturer part numbers, your customers' own part numbers and plain-text descriptions to the items in your catalog, and keeps the specs from the request with each line so your team can see what was matched and why.
The line is flagged for your team with the closest catalog items, and your team picks the substitute or sends it back to the contractor. Zaqa never treats a similar part as equivalent on its own.
Zaqa works through a BOM line by line, whether it's a spreadsheet, a PDF or a list in an email, and every line is either matched or flagged. The best test is your own: bring a few of your longest real BOMs to the demo.
When a detail the catalog needs is missing, like a coil voltage or a pole count, the line is flagged with the catalog configurations that could fit, all unconfirmed. Your team decides, usually from the project documents.
Zaqa applies the pricing information and customer-specific rules you make available to it, as set up with your team during implementation, and the quote stays reviewable before it goes out.
Yes. Substitutions, flagged lines and the finished quote all go to your team for review. Nothing goes out without a person approving it.
No. Zaqa works alongside the ERP and quoting process you already use. How it connects depends on your system and the access available, and we confirm the approach with you during discovery.

Let's see your BOM

Bring us the parts list nobody wants to key in.

The 80-line spreadsheet. The mix of manufacturer part numbers. The items that take three catalog searches to find.

Let's see what Zaqa can take off your team's plate.

Your customers keep sending their lists. Your team gets back to selling.