For commercial lighting suppliers
Every fixture has a spec. Your team shouldn't have to key in every one.
Fixture schedules come packed with type codes, lumens, color temperatures, drivers, finishes and mounting requirements. Zaqa matches the details to your catalog, flags what needs review, and prepares the quote for your team to approve.
Less decoding. Less rekeying. More quotes out the door.
/Brightway ElectricHarborview-Lighting-Schedule-RevB.pdfLighting fixture schedule
Harborview Office Renovation · HV-2408 · Northline Design + Engineering
SHEET
E-601
REV
B
ISSUED
11/10/26
| Type | Description | Dimming | Qty* |
|---|---|---|---|
| A1 | 2×4 recessed LED troffer, white | 0–10V | 18 |
| P1 | 4' linear direct/indirect pendant, matte black | 0–10V | 12 |
| W1 | Architectural LED wall sconce, bronze | Phase | 8 |
| D1 | 4" recessed LED downlight, white trim | — | 24 |
*Quantities from the project lighting takeoff (separate document).
Finishes per architect. Alternates require written approval.
Lighting quote draft · HV-2408 · Contractor BWE-1182
New01 · Fixture schedule received
Sound familiar?
The fixture schedule is already written. Why is your team building it again?
The engineer has specified the fixtures. The project team has sent the schedule. Now someone has to turn all those type codes, ordering options and spec notes into a quote.
And there are three more projects waiting.
01
Every fixture has its own set of details.
A1 needs 3500K and 0–10V dimming. P1 needs a black finish and suspended mounting. D1 has a driver question.
Your team has to keep those details straight across every fixture type.
2×4 recessed LED troffer, white
- CCT
- 3500K
- Dim
- 0–10V
- Mount
- Grid
4' linear direct/indirect pendant, matte black
- CCT
- 3500K
- Dim
- 0–10V
- Mount
- Suspended
Architectural LED wall sconce, bronze
- CCT
- 3000K
- Dim
- Phase
- Mount
- Wall
4" recessed LED downlight, white trim
- CCT
- 3000K
- Dim
- ? not specified
- Mount
- Recessed
02
A similar fixture isn't necessarily an equal.
The output might match, but the dimming protocol doesn't. The mounting is different. Or the schedule names a specific manufacturer.
Alternates need to be reviewed, not guessed.
Needs review: not an equal as proposed
Illustrative comparison.
03
The quote is due, and the schedule just changed.
A revised schedule and new project notes mean another round of checking what changed and updating the quote.
Your experienced people end up doing manual comparison work when they should be moving the project forward.
- A13500K · Qty 163500K · Qty 18
- P1Matte whiteMatte black
- W11,100 lm · 3000K1,100 lm · 3000K
- D11,000 lm1,500 lm
Illustrative. Every change found by hand, then the quote updated again.
Your lighting experts should be reviewing the specifications, not retyping them.
From fixture schedule to quote
All those fixture details. None of the manual rekeying.
Your customers send the project documents. Zaqa helps turn them into a quote your team can review.
Harborview Office Renovation · HV-2408
- PDFHarborview-Lighting-Schedule-RevB.pdfSheet E-601, Rev B · 4 fixture types
- XLSXHarborview-Lighting-Takeoff.xlsxQuantities by type
- PDFSpec 26 51 00 - Interior Lighting.pdfDrivers, dimming, alternates
Sample project and illustrative screens. Fixture references, catalog numbers and prices are fictional.
Built for lighting quotations
Your projects aren't one-size-fits-all. Your quoting shouldn't be either.
More than reading a PDF
Copying a schedule into a spreadsheet isn't the job. Each fixture type has to be understood as a set of requirements.
P1→ 4' D/I pendant · 5,000 lm · 3500K/90 · 0–10V
Match the fixture, not just the description
A 4-foot linear isn't a match because the length is right. CCT, lumens, voltage, dimming, mounting and finish all count.
3500K · 0–10V · 120–277V · suspended · matte black
Keep substitutions in your team's hands
When the specified fixture isn't one you carry, the closest catalog options go to your team. Approving an equal is never automatic.
Specified fixture not carried · 2 options for review
Work with your pricing and ERP
The goal is to stop entering everything twice, not to replace the systems your quotations team depends on.
Lighting quote draft · for your team to approve
Quote around your actual catalog
Your products, their configured options and your rules are what every fixture type is matched against.
Every line points to a configuration you sell
Before and after
Same fixture schedule. A whole lot less work.
The traditional way
- 1Open the lighting schedule
- 2Identify each fixture type
- 3Look up the specified fixture
- 4Verify lumens, CCT, voltage and dimming
- 5Find the right configuration
- 6Research alternates where permitted
- 7Enter the lines into the ERP
- 8Build and review the quote
By hand, for every fixture type, on every project.
With Zaqa
- 1Receive the fixture scheduleAs always
- 2Review the catalog matches Zaqa preparedYour team
- 3Resolve spec questions and proposed alternatesYour team
- 4Review the prepared quoteYour team
The decoding and rekeying are done before your team opens it. The specification calls stay theirs.
Customer story · Global Furniture Group
Different catalog. The same matching problem.
Global Furniture Group makes furniture, not luminaires. But their team faced the same work your quotations desk does: products with many configurable options, documents in every format, and every line matched to the right configuration and keyed into an IBM AS/400 by hand.
- 31 → 2 min
- Hands-on time per order
- 7,200
- Orders in the first 90 days
- 3,400+ hrs
- Returned to their team
Same idea for a fixture schedule: Zaqa matches each type to the configuration you sell, your team settles what's flagged, and your ERP stays put.
Read the Customer StoryCommon questions
Lighting projects have a lot of moving parts. Let's talk about them.
Let's see your fixture schedule
Bring us the fixture schedule that's taking over your inbox.
The 40 fixture types. The missing driver details. The specified products you don't carry.
Let's see what Zaqa can take off your quotations team's plate.
Your customers keep sending their schedules. Your team gets back to the work that matters.