For HVAC distributors
Every model. Every spec. Without the manual lookup marathon.
Equipment schedules, parts lists, and contractor requests come in every format. Zaqa matches models and parts to your catalog, flags what needs attention, and prepares quotes and orders. Your team approves them. Then approved orders go into your existing ERP.
Less searching. Less rekeying. Faster responses to contractors.
/Northeast Mechanical ServicesWestbrook-HVAC-Equipment-Schedule.pdfMechanical equipment schedule
Westbrook Distribution Center · RFQ-5621 · Corwin Engineering
SHEET
M-601
REV
B
ISSUED
11/11/26
| Tag | Qty | Equipment | Cooling | V / Ph |
|---|---|---|---|---|
| RTU-1 | 1 | Packaged RTU | 7.5 ton | 460/3 |
| C-1 | 1 | Roof curb | — | — |
| RTU-2 | 1 | Packaged RTU | 5 ton | — |
Basis of design shown; equivalents subject to engineer review. Curbs per manufacturer for unit served.
HVAC quote draft · RFQ-5621 · Contractor NEM-3140
New01 · Equipment schedule received
Sound familiar?
The contractor sent the equipment schedule. Your team still has to build the quote.
RTU-1 needs 460-volt, three-phase power and an economizer. RTU-2 is missing electrical details. The roof curb needs to match the unit.
Your inside sales team knows what to look for. But finding every product, checking every option and entering it into the ERP still takes time.
01
The model number is only the beginning.
Equipment capacity, voltage, phase, options and accessories all matter.
Your team has to make sure the quoted product matches the actual request.
Model #
RTA090G4E
- RTA
- Packaged rooftop, gas/electric
- 090
- 90 MBH nominal · 7.5 ton
- G
- Gas heat
- 4
- 460V / 3PH
- E
- Factory economizer
Illustrative nomenclature for a fictional manufacturer. Every line has its own.
02
An equivalent isn't always equivalent.
The original model is unavailable. A similar unit might have different electrical requirements, controls, dimensions or accessories.
Your people have to review those differences before recommending an alternative.
Same tonnage, same voltage. Not the same unit. Needs review.
Illustrative comparison.
03
The next contractor is already waiting.
While someone is working through a long mechanical schedule, the counter phone is ringing and parts requests are arriving.
Your team shouldn't have to choose between accurate quotes and responding quickly.
- PDFRFQ-5621 · 12-line RTU scheduleIn progress
- EmailPart # 1142-883 · “is this discontinued?”8 min
- CallCounter · capacitor for a condenserNow
- EmailPO-7781 · filters, 24 cases14 min
- PhotoData plate · “need this motor”21 min
Illustrative.
Your HVAC experts should be solving equipment questions, not retyping schedules.
From equipment schedule to quote
From contractor request to quote. Without the catalog scavenger hunt.
The Westbrook RFQ again, requirement by requirement: what the schedule asks for, what your catalog has, and what your team decides.
Northeast Mechanical Services7:42 AM
RFQ-5621 · Westbrook DC rooftop units
“Schedule attached. Need pricing on the RTUs and curb by Thursday. Delivery to site, crane day TBD.”
Sample RFQ and illustrative screens. Contractor, manufacturer, model numbers and prices are fictional.
Beyond equipment quotes
Not every order starts with a mechanical schedule.
Sometimes it's a contractor emailing a part number. Sometimes it's a photo of an equipment label. Sometimes it's a call from someone standing at a jobsite who needs the right replacement part.
Those requests still need to become accurate orders.
Bay State Service Co.10:18 AM
“Need a replacement blower motor for this unit. Attached is the model and serial information.”
AERLINE
IMG_4471.jpg · data plate photo
MTR-0522
Blower motor · replaces MTR-0419
- 1Request readModel RTA-060G2 from the data plate · part: blower motor
- 2Catalog lookupOEM MTR-0419 · superseded by MTR-0522 in your catalog
- 3Fit needs checkingMatched by model only. Confirm against the OEM parts list for this serial range.
- 4Order line preparedMTR-0522 · blower motor, 1/2 HP, 208-230V · qty 1 · draft order for review
Illustrative. Zaqa organizes the request and the lookup; it doesn't diagnose the unit.
Whether it's a full equipment schedule or a single replacement part, your team shouldn't have to start from scratch.
How phone orders work →Built for the way HVAC distributors work
Your products have specifications. Your automation should understand them.
Beyond basic document extraction
Technical equipment details have to become usable product records, not a copy of the schedule.
RTU-1 → RTA-090G4E · 7.5 TON · 460V/3PH
Your catalog is the source of truth
Model numbers, options, accessories and the catalog relationships you maintain guide every match.
C-1 → RC-14-AL · listed for RTA-090
Equivalents stay in your team's hands
Possible substitutes are reviewed with their differences, never treated as interchangeable.
Alternate · 3 differences · for review
Multiple ways to receive requests
Equipment schedules, emailed parts lists, contractor orders and phone calls can all feed the same workflow.
PDF · email · photo · call
Your ERP and pricing remain in place
Repetitive work is automated without replacing the systems your inside sales team relies on.
HVAC quote draft · for your team to approve
Before and after
Same equipment schedule. A lot less manual work.
Without Zaqa
- 1Open the contractor's schedule
- 2Identify the requested equipment
- 3Search manufacturer catalogs
- 4Check model specifications
- 5Verify voltage, phase and accessories
- 6Investigate alternatives
- 7Look up customer pricing
- 8Enter every line into the ERP
- 9Build and review the quote
By hand, for every tag, on every schedule.
With Zaqa
- 1Receive the equipment scheduleAs always
- 2Review matched catalog itemsYour team
- 3Resolve missing specifications or alternativesYour team
- 4Review the prepared quoteYour team
The lookups and entry are done before your team opens it. The equipment calls stay theirs.
Customer story · Global Furniture Group
Not an HVAC distributor. The same lookup problem.
Global Furniture Group makes furniture, not rooftop units. But their team faced the same work your inside sales desk does: requests in every format, products defined by options, and every line matched to the right item and keyed into an IBM AS/400 by hand.
- 31 → 2 min
- Hands-on time per order
- 7,200
- Orders in the first 90 days
- 3,400+ hrs
- Returned to their team
These are their furniture results, not HVAC ones. The idea carries over: Zaqa matches each line to what you sell, your team settles what's flagged, and your ERP stays put.
Read the Customer StoryCommon questions
Different equipment. Different questions. Your team knows the drill.
Let's see your HVAC requests
Bring us the equipment schedule nobody wants to quote by hand.
The 12-line rooftop unit schedule. The model number nobody can find. The replacement part request with half the details missing.
Let's see what Zaqa can take off your team's plate.
Your contractors keep sending requests. Your team gets back to helping them.