Skip to content

For HVAC distributors

Every model. Every spec. Without the manual lookup marathon.

Equipment schedules, parts lists, and contractor requests come in every format. Zaqa matches models and parts to your catalog, flags what needs attention, and prepares quotes and orders. Your team approves them. Then approved orders go into your existing ERP.

Less searching. Less rekeying. Faster responses to contractors.

/Northeast Mechanical ServicesWestbrook-HVAC-Equipment-Schedule.pdf

Mechanical equipment schedule

Westbrook Distribution Center · RFQ-5621 · Corwin Engineering

SHEET

M-601

REV

B

TagQtyEquipmentCoolingV / Ph
RTU-11Packaged RTU7.5 ton460/3
C-11Roof curb——
RTU-21Packaged RTU5 ton—

Basis of design shown; equivalents subject to engineer review. Curbs per manufacturer for unit served.

Matched to your catalog

HVAC quote draft · RFQ-5621

New
Approve quote

01 · Equipment schedule received

Sound familiar?

The contractor sent the equipment schedule. Your team still has to build the quote.

RTU-1 needs 460-volt, three-phase power and an economizer. RTU-2 is missing electrical details. The roof curb needs to match the unit.

Your inside sales team knows what to look for. But finding every product, checking every option and entering it into the ERP still takes time.

01

The model number is only the beginning.

Equipment capacity, voltage, phase, options and accessories all matter.

Your team has to make sure the quoted product matches the actual request.

Model #

RTA090G4E

RTA
Packaged rooftop, gas/electric
090
90 MBH nominal · 7.5 ton
G
Gas heat
4
460V / 3PH
E
Factory economizer

Illustrative nomenclature for a fictional manufacturer. Every line has its own.

02

An equivalent isn't always equivalent.

The original model is unavailable. A similar unit might have different electrical requirements, controls, dimensions or accessories.

Your people have to review those differences before recommending an alternative.

RTU-1SpecifiedAvailable alternate
Cooling7.5 ton✓7.5 ton
Electrical460V / 3PH✓460V / 3PH
EconomizerFactory✕Field-installed kit
ControlsBACnet✕Standard
CurbRC-14-AL✕Different footprint

Same tonnage, same voltage. Not the same unit. Needs review.

Illustrative comparison.

03

The next contractor is already waiting.

While someone is working through a long mechanical schedule, the counter phone is ringing and parts requests are arriving.

Your team shouldn't have to choose between accurate quotes and responding quickly.

Inside sales · this morning5 waiting
  • PDFRFQ-5621 · 12-line RTU scheduleIn progress
  • EmailPart # 1142-883 · “is this discontinued?”8 min
  • CallCounter · capacitor for a condenserNow
  • EmailPO-7781 · filters, 24 cases14 min
  • PhotoData plate · “need this motor”21 min

Illustrative.

Your HVAC experts should be solving equipment questions, not retyping schedules.

From equipment schedule to quote

From contractor request to quote. Without the catalog scavenger hunt.

The Westbrook RFQ again, requirement by requirement: what the schedule asks for, what your catalog has, and what your team decides.

Northeast Mechanical Services7:42 AM

RFQ-5621 · Westbrook DC rooftop units

“Schedule attached. Need pricing on the RTUs and curb by Thursday. Delivery to site, crane day TBD.”

PDF Westbrook-HVAC-Equipment-Schedule.pdfSpec 23 74 13.pdf
RTU-1C-1RTU-2from sheet M-601, Rev B

Sample RFQ and illustrative screens. Contractor, manufacturer, model numbers and prices are fictional.

Beyond equipment quotes

Not every order starts with a mechanical schedule.

Sometimes it's a contractor emailing a part number. Sometimes it's a photo of an equipment label. Sometimes it's a call from someone standing at a jobsite who needs the right replacement part.

Those requests still need to become accurate orders.

Bay State Service Co.10:18 AM

“Need a replacement blower motor for this unit. Attached is the model and serial information.”

AERLINE

MODEL RTA-060G2SERIAL 2214W03871VOLTS 208-230PH 3 · HZ 60BLOWER 1/2 HPR-454B

IMG_4471.jpg · data plate photo

EmailData plate photoPhone callContractor PO

MTR-0522

Blower motor · replaces MTR-0419

Review fit
  1. 1Request readModel RTA-060G2 from the data plate · part: blower motor
  2. 2Catalog lookupOEM MTR-0419 · superseded by MTR-0522 in your catalog
  3. 3Fit needs checkingMatched by model only. Confirm against the OEM parts list for this serial range.
  4. 4Order line preparedMTR-0522 · blower motor, 1/2 HP, 208-230V · qty 1 · draft order for review

Illustrative. Zaqa organizes the request and the lookup; it doesn't diagnose the unit.

Whether it's a full equipment schedule or a single replacement part, your team shouldn't have to start from scratch.

How phone orders work →

Built for the way HVAC distributors work

Your products have specifications. Your automation should understand them.

Beyond basic document extraction

Technical equipment details have to become usable product records, not a copy of the schedule.

RTU-1 → RTA-090G4E · 7.5 TON · 460V/3PH

Your catalog is the source of truth

Model numbers, options, accessories and the catalog relationships you maintain guide every match.

C-1 → RC-14-AL · listed for RTA-090

Equivalents stay in your team's hands

Possible substitutes are reviewed with their differences, never treated as interchangeable.

Alternate · 3 differences · for review

Multiple ways to receive requests

Equipment schedules, emailed parts lists, contractor orders and phone calls can all feed the same workflow.

PDF · email · photo · call

Your ERP and pricing remain in place

Repetitive work is automated without replacing the systems your inside sales team relies on.

HVAC quote draft · for your team to approve

Before and after

Same equipment schedule. A lot less manual work.

Without Zaqa

  1. 1Open the contractor's schedule
  2. 2Identify the requested equipment
  3. 3Search manufacturer catalogs
  4. 4Check model specifications
  5. 5Verify voltage, phase and accessories
  6. 6Investigate alternatives
  7. 7Look up customer pricing
  8. 8Enter every line into the ERP
  9. 9Build and review the quote

By hand, for every tag, on every schedule.

With Zaqa

  1. 1Receive the equipment scheduleAs always
  2. 2Review matched catalog itemsYour team
  3. 3Resolve missing specifications or alternativesYour team
  4. 4Review the prepared quoteYour team

The lookups and entry are done before your team opens it. The equipment calls stay theirs.

Customer story · Global Furniture Group

Not an HVAC distributor. The same lookup problem.

Global Furniture Group makes furniture, not rooftop units. But their team faced the same work your inside sales desk does: requests in every format, products defined by options, and every line matched to the right item and keyed into an IBM AS/400 by hand.

31 → 2 min
Hands-on time per order
7,200
Orders in the first 90 days
3,400+ hrs
Returned to their team

These are their furniture results, not HVAC ones. The idea carries over: Zaqa matches each line to what you sell, your team settles what's flagged, and your ERP stays put.

Read the Customer Story

Common questions

Different equipment. Different questions. Your team knows the drill.

Yes. Zaqa reads mechanical equipment schedules and bid packages tag by tag, with each unit's tonnage, voltage and phase, heating, options and accessories, from the PDFs, spreadsheets and emails contractors send, and matches each line to your catalog.
Yes. Zaqa matches manufacturer models, customer part numbers and plain-text descriptions to the items in your catalog, and checks the line's specifications against the item rather than trusting the name alone.
The line is flagged with the closest matches from your catalog, with what differs, so your team picks the alternative before it's quoted. An equivalent is never treated as approved on its own; that stays with your team and, where needed, the engineer.
Zaqa looks up the part against your catalog using the model, part number and description the contractor gives, including the catalog relationships you maintain. Where fit can't be confirmed from what was sent, the line goes to your team to check against the OEM's parts information.
The line is flagged with what's missing and the catalog configurations it could be, all unconfirmed. Your team confirms it from the drawings or with the contractor, and only then is it quoted.
Calls you make or take can be transcribed live, with a consent announcement, and the transcript can start a draft order or quote or update an existing one. Every change is approved by your team before it reaches your ERP. Walk-in counter sales still go through your existing process.
Zaqa applies the pricing you make available to it, including contractor- and project-specific prices you've configured. We go through your pricing setup in discovery and confirm what's in place before you rely on it.
No. Zaqa matches what the contractor asked for to items in your catalog. AHRI ratings, equipment sizing, load calculations, refrigerant compatibility and code compliance stay with the engineer, the contractor and your team.
Yes. Zaqa prepares quotes and orders for your team to approve, and approved orders go into your existing ERP. How it connects depends on your system and the access available; we confirm the approach with you during discovery.
Yes. Flagged lines and the finished quote or order go to your team, and nothing goes to the contractor until a person approves it.

Let's see your HVAC requests

Bring us the equipment schedule nobody wants to quote by hand.

The 12-line rooftop unit schedule. The model number nobody can find. The replacement part request with half the details missing.

Let's see what Zaqa can take off your team's plate.

Your contractors keep sending requests. Your team gets back to helping them.